P6 Construction Scheduler Job at SL Recruit, Washington DC

cnJ3TDZqYkhxUUdEWFZFd0xPV2ZqWlY5UWc9PQ==
  • SL Recruit
  • Washington DC

Job Description

The ideal candidate will be responsible for developing and maintaining all levels of schedules from proposals phase through the life cycle of design, procurement, preconstruction, and construction phases. Candidate should have the experience and or ability to coordinate with architects, engineers, clients, and subcontractors to create project schedules in an effective manner. The Project Scheduler must be a flexible and adaptable team-player, as well as have strong communication and client service skills.

Responsibilities:

  • Create/develop Critical Path Methodology (CPM) schedule and fully resource loaded.
  • Perform schedule updates and maintenance functions as required by client’s contract.
  • Review third-party/subcontractors construction schedules and provide review comments.
  • Provide project schedule narrative report and associated schedule supporting reports as required by client or schedule specification.
  • Create schedule reporting documents to communicate project execution sequencing and/or progress assessments.
  • Develop practical and logic driven CPM schedule from construction drawing and documents.
  • Understand principles of cost estimating and productivity in establishing schedule parameters (duration and resource loading, etc.).
  • Effectively communicate project schedule status in project meetings, presentation, or preconstruction briefing.

Requirements:

  • 5+ years experience in a scheduling role for a general contractor
  • Well-versed in Primavera

Job Tags

Contract work, For contractors, For subcontractor, Flexible hours,

Similar Jobs

Gentle Dental Careers

Dental Assistant Job at Gentle Dental Careers

$1,000 sign on bonus Pay up to $22 per hour At Gentle Dental, we value our teammates smile as much as our patients smile....  ...on experience $1,000 sign on bonus Benefits ~ Employee Assistance Program ~ Medical and pharmacy, dental, vision (for employees... 

The Judge Group

Clinical Administrator Job at The Judge Group

 ...ME 04412. Pay: $18/hr Job Description: Positions function includes being responsible for initial triage of members, administrative intake of members or managing the admission/discharge information post-notification, working with hospitals and the clinical team... 

Gap Inc.

Senior Photographer, On-Figure Job at Gap Inc.

About Gap Inc. Our brands bridge the gaps we see in the world. Old Navy democratizes style to ensure everyone has access to quality fashion at every price point. Athleta unleashes the potential of every woman, regardless of body size, age or ethnicity. Banana Republic...

HANWHA ADVANCED MATERIALS AMERICA, LLC

Mold Repair Lead Technician Job at HANWHA ADVANCED MATERIALS AMERICA, LLC

 ...Purpose; Scope of Responsibility: The Mold Repair Technician with a background in Tool & Die Fabrication is responsible for the maintenance, repair, and troubleshooting of molds used in production processes. This role supports the maintenance department by ensuring all... 

FootBridge

Construction Manager Job at FootBridge

 ...Title: Construction Manager Location: Delta, UT and Adelanto, CA Duration: Direct hire Salary : $160,000 - $170,000 Per Diem: Yes Our client is an EPC contractor specializing in the installation of utility and industrial process infrastructure including...